Level, compacted ground
The pad needs to be level within a few inches across the footprint and compacted so the building does not settle unevenly. Loose fill or soft spots will show up as movement later.
If the site slopes, decide in advance whether to cut into the hill, build up a pad, or use taller legs on the downhill side.
Drainage
Water should move away from the building, not through it. Roof runoff concentrated at one corner can erode the pad and undermine anchors. Plan for gutters, a splash pad, or grading that directs water away.
Truck and crew access
Delivery trucks are long and heavy. They need a clear path, adequate width, and enough turning room. Low branches, fences, gates, and soft ground are common access problems. Send photos of your driveway when requesting a quote.
Utilities and obstructions
Locate underground electric, water, gas, and septic lines before anyone drives anchors. Also clear the footprint of stumps, rocks, and old concrete.
- Call 811 to mark underground utilities
- Clear the footprint and a working perimeter
- Trim low branches along the access route
- Confirm gate widths for the delivery vehicle
- Have the pad graded and compacted
- Decide on anchor type for your surface
What we handle
We bring the building, the crew, and the installation equipment. We will confirm the pad is ready before starting and advise on any last-minute adjustments. If the site is not ready, we will tell you rather than install on a bad pad.